ABOUT
~2010
-
An engineering division for BUDI OIL ENTERPRISE Sdn Bhd
-
Design and developed 30mt/h methyl ester plant from palm sludge oil;
-
Studied and initial design of a Bio-refinery, producing bio-ethanol from ligno-cellulosic feedstocks;
-
Development of pulping method of EFB for fiber moulding process;
-
Development of calcium soap plant;
-
Upgrading & rectification of biodiesel plant into Epoxidize Palm Oil (EPO) production plant;
-
Initial design for Di-hydroxyl Stearic Acid (DHSA) plant (joint effort with Malaysia Palm Oil Board).
-
New company was established, PRIMAWANI Sdn Bhd.
2011 ~ 2012
-
Rebranding and company renamed to O'REC IND Sdn Bhd.
-
Research and design for EFB dewatering and oil recovery;
-
Development of Physical refining plant for Sludge palm oil (SPO).
-
Development of palm pollination bags from spunbund polyethylene materials (for FELDA)
-
Development of palm oil blended wax for rat bait production (for FELDA)
2013 ~ 2014
-
Development of burner utilizing various ratios of emulsion fuels.
-
Development of modular Coco-Betaine production line
-
Design and development of high intensity sludge treatment process for POME using AQUARATOR (with JICA, MPOB)
-
Upgrading Jengka 21 Palm Oil Mill polishing plant by installing mechanical filter and submerged mechanical agitator AQUARATOR.
-
Design and develop gas mixing-type Anaerobic Digester c/w burner for Pasir Panjang Palm Oil Mill, Kota Tinggi, Johor
-
Installation of particulate matter emission control system HURRICANE for 30mt/h biomass boiler at Pasir Panjang Palm Oil Mill, Johor
2015 ~ 2016
-
Design and develop POME mixing-type Anaerobic Digester c/w POME sludge treatment system and gas engine for Sindora Palm Oil Mill, Kluang, Johor.
-
Design 5Mt/h clinical waste disposal system using pyrolysis technology for Medivest Group.
-
Installation of particulate matter emission control system HURRICANE System for 30mt/h biomass boiler at Kuala Suai Palm Oil Mill, Sarawak
-
Installation of particulate matter emission control system HURRICANE System for 40mt/h biomass boiler for Dominion Square Palm Oil Mill
-
Installation of particulate matter emission control system HURRICANE System for 30mt/h biomass boiler at Sindora Palm Oil Mill, Johor
-
Designing of bio-CNG upgrading system for POME biogas and Landfill Gas (LFG) & MoU with Bukit Tagar Sanitary Landfill for 2000m3/h methane upgrading system
2017 ~ 2018
-
Development of bio-heavy fuel facility treating palm oil residue and high FFA feedstock to comply normal standard for boiler & generators combustion.
-
Development of bio-MBR ceramic membrane for palm oil effluent
-
Design and construct membrane filtration system for Rainbow Pellet, Lipis, Pahang
-
Design and construct gas mixing-type Anaerobic Digester c/w polishing plant for Ladang Tereh Palm Oil Mill, Kluang, Johor.
-
Design and construct POME treatment plant for KIlang Sawit Pasir Panjang
-
Design and construct Electrostatic Precipitator (ESP) for Kilang Sawit Bukit Bandi, Terengganu
2019 ~ 2020
-
Design and construct Anaerobic Digester c/w methane upgrading system for Sedenak Palm Oil Mill (under subsidiary company MTC-Orec Sdn Bhd)
-
Partnership with NHK Japan to supply Industrial Grade Palm Oil (IGPO) for Power Plant in Japan.
-
Design and developed 2,000m3/hr methane upgrading plant for Coronation Palm Oil Mill, Kluang, Johor.
-
Design and construct gas mixing-type Anaerobic Digester c/w polishing plant for Kilang Sawit Bukit Bandi, Kemaman, Terengganu.