PROJECTS

PASIR PANJANG BIOGAS c/w BOILER CO-FIRING BURNER
The system was design for a 45mt palm oil mill and the captured biogas is sent into biomass boiler.

SINDORA BIOGAS c/w ACTIVATED SLUDGE PROCESS
Sindora POM is a 45mt mill and the system comprises of biogas generation, biogas treatment and electric generation by gas engine. It also comes with polishing plant to treat POME before being discharged.

SINDORA HURRICANE SYSTEM
MPOB funded project, is to reduce the particulate matter below 150mg/Nm3 after a biomass boiler.

JENGKA 21 ACTIVATED SLUDGE PROCESS WITH AQUARATOR
The project was funded by Japan International Cooperation Agency (JICA) to demonstrate the Aquarator, a submersible oxygen mixer to help reducing BOD for POME treatment.

KUALA LIPIS MEMBRANE FILTRATION
Flat Plate Membrane is used to reduce the pellet plant wastewater below BOD20 before being discharged.

DOMINION SQUARE POLISHING PLANT
A project funded by IHI Corporation to be coupled with their UASB reactor.

LADANG TEREH BIOGAS c/w POLISHING PLANT
Full integrated POME treatment system from a completely new ponds, biogas and polishing plant for a 70mt mill.

SEDENAK BIOGAS c/w BIO-METHANE FOR DIRECT GAS PIPELINE INJECTION
Known to be one of the largest biogas system, expected to generate more than 4,000m3/hr of biogas. The harvested gas will be purified to match natural gas standard before being injected into Gas Malaysia existing pipeline.

ACTIVATED SLUDGE PROCESS WITH AQUARATOR AT LADANG TEREH PALM OIL MILL
Activated Sludge Process using AQUARATOR as aeration device to to get better aeration efficiency & mixing.

ACTIVATED SLUDGE PROCESS WITH AQUARATOR AT PASIR PANJANG PALM OIL MILL
Activated Sludge Process using AQUARATOR as aeration device to to get better aeration efficiency & mixing. Use 4 unit F-55 AQUARATOR to achieve best aeration effect.

2.4 MW BIOGAS PLANT AT BUKIT BANDI PALM OIL MILL, KEMAMAN, TERENGGANU
Biogas Plant to generate 2.4MW electricity under FiT scheme.